Construction of Lakhami 1 & 2 Hydroelectric Power Plant

The Lakhami Hydropower Plant (HPP) development is located in the Svaneti region in the north western part of Georgia and Greater Caucasus, on the Lakhami river. The project was constructed by Synergy Construction Ltd.

Gergili LLC provided environmental consultation and was responsible for the development of the air emission discharge documentation (concrete plant, sand crushing plant) and weekly / monthly reports for the contractor.

Gergili LLC was responsible for conducing environmental trainings, development of the traffic management plan, as well as inspection of vehicle emissions and dust emissions in accordance with standards and periodic inspection of noise and vibration in accordance with project standards. Gergili LLC also conducted monitoring of the water quality abstracted from the water wells.

 

Start Date: 2018

End Date: Ongoing

Country: Georgia

Client: Austrian-Georgian Development Ltd

Origin of Funding: Cerberus Capital Management